Back
Wind Mountain project (4 JV) ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Wind Mountain project (4 JV)
ASSET TYPE
Exploration
Exploration METALS & MINERALS
Gold
SPECIFIC LOCATION
Reno, NV, USA
CURRENT ASSET STATUS
  • Optioned to null
OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Optionee Bravada gold corp. 100
0
0
CONDITIONAL OWNERSHIP NOTES

The past-producing Wind Mountain gold/silver project is located approximately 160km northeast of Reno, Nevada in a sparsely populated region with excellent logistics, including county-maintained road access and a power line to the property. A previous owner, AMAX Gold recovered nearly 300,000 ounces of gold and over 1,700,000 ounces of silver between 1989 and 1999 from two small open pits and a heap-leach operation (based on files obtained from Kinross Gold, successor in interest to AMAX Gold). Rio Fortuna Exploration (U.S.) Inc., a wholly owned US subsidiary of Bravada Gold Corporation, acquired 100% of the property through an earn-in agreement with Agnico-Eagle (USA) Limited, a subsidiary of Agnico-Eagle Mines Limited, which retains a 2% NSR royalty interest, of which 1% may be purchased.

ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Gold (k oz) Sold791
00000000Gold Recovery (%)794
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)
Date of Assessment
Jun 6, 2026