Temple Project (4 JV) ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
Temple Project (4 JV)
ASSET TYPE
Exploration
Exploration METALS & MINERALS
Gold
DEPOSIT TYPE
Carlin-type
SPECIFIC LOCATION
Eureka, NV 89316, USA
CURRENT ASSET STATUS
  • Optioned to null
OWNERSHIP STRUCTURE
COMPANY NAMESTAKE %NOTES
Optionee Bravada gold corp. 100
0
0
CONDITIONAL OWNERSHIP NOTES

Bravada can acquire 100% interest in 36 unpatented lode-mining claims (~290 hectares) that comprise this project, subject to a 2% NSR royalty retained by the underlying owner, which can be reduced to 1% by payment of US$1,000,000.

ASSET ACTIVITIES
ACTIVITYSTART DATEEND DATEPROGRESS
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Gold (k oz) Sold791
00000000Gold Recovery (%)794
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)
Date of Assessment
Jun 6, 2026